Soft Play Installation
INSTALLATION OF SOFT PLAYGROUND
(Contact for better instruction)
Second,we will take photos and send to our clients before residual payment.
Check bellow video and Example, for more details information please send us email!
Example HP-A3004
ASSEMBLE THE FRAME
1, if the playground have three floor, you need to clean the place and put the EVA mat on floor first! If only two floor, you can assemble the frame first then lift the frame and put the EVA mat on floor.
Frame mean iron pipe
only EVA mat
Do the installation one floor by floor, (floor one, floor two...). Start with the vertical pipe.
2, We have marked numbers A1, A2.... B1, B2 on the frame, So find all vertical pipe by number and height, If the playground is 280cm, Then all vertical pipe are 280cm (vertical pipe will not cut to shooter size), (Each vertical pipe have a yellow foot platform under it)
Numbers on 3D installation diagram and on Vertical Pipe. Foot platform
Most of horizontal pipe are on size 113cm, that mean no need to find the one between A1 and A2, anyone with same length will be fine.
3, Join the horizontal pipe with (vetical pipe from first floor) by Fastener.
All fastener already on the vertical pipe, (we have assembled before delivery and keep it on), If do have missing during delivery, find it on spare parts.
On installation diagram have show each fastener by color, ( same color mean same fastener)
Do not worry the height of horizontal pipe to ground, can be adjust any time.
Fastener which join
all iron pipes 3D
installation diagram for first floor
Compare the fastener
on Iron pipe with installation diagram, All correct then go for second floor.
4, Assemble bridge on first and second floor, These bridge have horizontal pipe on it. Just move to the correct position and join to vertical pipe.
This kinds of bridge are whole pieces, (pipes and strip cloth already assembled and packing together),
Bridge one Bridge two Bridge three Bridge four Bridge five
5,After finished all horizontal pipe, cover the top. On installation diagram many mark with many color, one color mean is whole piece. So all long pipe with out fastener on it are for top.
Horizontal pipe on top
6, Assemble all plastic parts, like tube, slide. Assemble trampoline, shooting game, ball pit and all soft play (like platform, ladder, window, house with roof and rim for slide.)
7,Assemble net around the playground, on top, and any gaps that kids may go on wrong directly or fall. (check video to see how)
Net (may yellow or
black color) string for tie net
8, Cover all iron pipe with PVC cover. (check video to see how)